Source: CMM 2025-07 Status: Active Effective From 03 Feb 2026 Supersedes CMM 2006-08 50 Report on disagreement in relation to CMM-2006-08 Full Text 50. A report on the disagreement shall be drawn up by the panel and forwarded through the TCC Chair to the Commission within two months of the TCC meeting at which the case is reviewed. Theme Inspection activity related requirement Sub Theme HSBI Category / CMR Section Report (Evaluation Criteria Not Required) Evaluation Criteria CCM Limits Risk (RBAF) No Evaluation Criteria Records CCM limits not applicable for this obligation Category: Report CMS Compliance History When Evaluated: Average Score:N/A Likelihood of Non-Compliance: Moderate Consequence of Risk Ratings CCM or collective group Consequence of Non-Compliance Risk of Non-Compliance